Your Purchase Price

$47,621
1/32

2026 Volvo® XC40

B5 AWD Plus

  • MSRP
    $50,260
  • Dealer Discount
    -$2,639
  • Pre-Delivery Service Fee
    +$1,195
  • Electronic Reg Filing Fee
    +$498
  • Your Purchase Price
    $49,314

Estimate your payment

Get a quick payment estimate based on basic loan terms.

Features

Vehicle Location

Crown Volvo Cars

6001 34th St N, St. Petersburg, FL 33714

View all vehicles at this location

Basic information

Stock #

VIN

Description

The 2026 Volvo XC40 B5 AWD Plus SUV is the epitome of modern luxury and cutting-edge technology, providing a sophisticated driving experience that combines power and efficiency.

With its striking Crystal White exterior, this sport utility vehicle radiates elegance and modernity. Paired with a stylish Blonde interior, featuring leather seating surfaces and genuine wood inserts on the dashboard and door panels, the XC40 exudes a warm and inviting atmosphere.

Under the hood, you'll find an advanced Intercooled Turbo Gas/Electric I-4 2.0 L/120 engine, complemented by an automatic transmission and an all-wheel drivetrain, ensuring a smooth and responsive ride. The hybrid fuel system enhances fuel efficiency, with an impressive 23 MPG in the city and 30 MPG on the highway.

🧊 Key Features:

  • Climate Package including Heated Rear Seats and Heated Steering Wheel
  • Protection Package Premier with Cargo Tray, First Aid Kit, Rubber Floor Mats, and Wheel Locks
  • Google Maps Navigation System with a 4-year subscription
  • Apple CarPlay and Android Auto connectivity
  • 8-Speaker Radio: High Performance Sound System
  • Safe driving with Pixel Headlight Technology, Auto High-beam Headlights, Front and Rear Fog Lights

🌟 Safety and Security:

  • Dual front and side impact airbags
  • Electronic Stability Control and Traction Control
  • Emergency communication system
  • Anti-lock braking system (ABS) with 4-Wheel Disc Brakes
  • Security system and Panic alarm

💺 Comfort and Convenience:

  • Power moonroof and Power Liftgate
  • Front dual zone A/C and Automatic temperature control
  • Auto-dimming door and Rear-View mirrors
  • Rain sensing wipers and Rear window wiper
  • Power adjustable front seats with memory function
  • Split folding rear seat and Rear seat center armrest

Enhancing its practicality, the XC40 features alloy wheels with 19" 5-Y Spoke Matte Graphite Alloy, making a bold statement on the road. The remote keyless entry and steering wheel-mounted audio controls provide ease of use and convenience at your fingertips.

With an odometer reading of just 7 miles, this new Volvo XC40 promises unparalleled luxury, efficiency, and safety, making it a perfect choice for your next adventure. 🌍

Dealership Information

Sunday

Closed

Monday

9:00am - 7:30pm

Tuesday

9:00am - 7:30pm

Wednesday

9:00am - 7:30pm

Thursday

9:00am - 7:30pm

Friday

9:00am - 7:30pm

Saturday

9:00am - 6:00pm

2026 Volvo® XC40

B5 AWD Plus

  • MSRP
    $50,260
  • Dealer Discount
    -$2,639
  • Pre-Delivery Service Fee
    +$1,195
  • Electronic Reg Filing Fee
    +$498
  • Your Purchase Price
    $49,314